어떤 순서로 리모델링을 올바르게 수행해야 합니까?
리몬트는 계속됩니다... 미래 리몬트를 계획하고 일부를 직접 수행해야하는 순서를 잘 모르겠습니다. CcFounderzy에게 요청합니다. 아래 작업을 적절하게 정렬해 주실 수 있습니까? :)
- 나무 바닥 연마
- 실내 문와 함께 문틀 교체
- 외부 문 교체
- 욕실 총리모트
- 방 벽면 페인트칠
도움과 지식을 간청합니다 :)
리몬트는 계속됩니다... 미래 리몬트를 계획하고 일부를 직접 수행해야하는 순서를 잘 모르겠습니다. CcFounderzy에게 요청합니다. 아래 작업을 적절하게 정렬해 주실 수 있습니까? :)
- 나무 바닥 연마
- 실내 문와 함께 문틀 교체
- 외부 문 교체
- 욕실 총리모트
- 방 벽면 페인트칠
도움과 지식을 간청합니다 :)
Show original content
0 users upvote it!
5 answers
Popular
K
If I were to do these tasks, I would start with: 1. Bathroom renovation 2. Replacement of external doors 3. Dismantling of internal door frames, sanding of wooden floors 4. Painting walls in the rooms 5. Installation of internal doors
If I were to do these tasks, I would start with: 1. Bathroom renovation 2. Replacement of external doors 3. Dismantling of internal door frames, sanding of wooden floors 4. Painting walls in the rooms 5. Installation of internal doors
Machine translated
1 likes
O
According to standard recommendations, the order of work during renovation should be as follows: Sanding wooden floors Replacement of internal door frames with doors Replacement of external doors General renovation of the bathroom Painting walls in rooms The first step involves sanding wooden floors, as this is a labor-intensive task that can cause dirt and debris. Doing this at the beginning of the renovation will help avoid damage or dirt on new surfaces. The next step is the replacement of internal door frames with doors. This is a labor-intensive task that may require trimming doors to fit the new frames. Doing this before other work will help maintain the integrity and cleanliness of newly painted walls. After replacing the door frames, the next step is to replace the external doors. It is logical to do this before the general renovation of the bathroom, as it requires work outside the building, and opening the building to weather conditions may be impractical during bathroom renovations. Next comes the general renovation of the bathroom. This step usually involves dismantling old elements such as the bathtub, sink, toilet, etc., and installing new bathroom fixtures. Dismantling and installation can create a lot of dust and dirt, so it is better to do it before painting the walls. The final stage is painting the walls in the rooms. After completing all the previous work, painting is the easiest task and should not cause major cleanliness difficulties.
According to standard recommendations, the order of work during renovation should be as follows: Sanding wooden floors Replacement of internal door frames with doors Replacement of external doors General renovation of the bathroom Painting walls in rooms The first step involves sanding wooden floors, as this is a labor-intensive task that can cause dirt and debris. Doing this at the beginning of the renovation will help avoid damage or dirt on new surfaces. The next step is the replacement of internal door frames with doors. This is a labor-intensive task that may require trimming doors to fit the new frames. Doing this before other work will help maintain the integrity and cleanliness of newly painted walls. After replacing the door frames, the next step is to replace the external doors. It is logical to do this before the general renovation of the bathroom, as it requires work outside the building, and opening the building to weather conditions may be impractical during bathroom renovations. Next comes the general renovation of the bathroom. This step usually involves dismantling old elements such as the bathtub, sink, toilet, etc., and installing new bathroom fixtures. Dismantling and installation can create a lot of dust and dirt, so it is better to do it before painting the walls. The final stage is painting the walls in the rooms. After completing all the previous work, painting is the easiest task and should not cause major cleanliness difficulties.
Machine translated
a
The order of the tasks in a sense is arbitrary because the bathroom has nothing to do with the room, but I would leave the bathroom for last, which means 2, 3, 51, 4 but that's just me. The bathroom is left for last because it is always used, so it's better to leave it for the end.
The order of the tasks in a sense is arbitrary because the bathroom has nothing to do with the room, but I would leave the bathroom for last, which means 2, 3, 51, 4 but that's just me. The bathroom is left for last because it is always used, so it's better to leave it for the end.
Machine translated
S
To start, replace the exterior doors! So that you are warm. Then, remove the interior doors with frames and start painting the walls and renovating the bathroom before installing the new doors. After that, you can begin refurbishing the tired floors, but once you sand them, they will be great.
To start, replace the exterior doors! So that you are warm. Then, remove the interior doors with frames and start painting the walls and renovating the bathroom before installing the new doors. After that, you can begin refurbishing the tired floors, but once you sand them, they will be great.
Machine translated
5/5